top of page

Retaining wall repair for quay - 2024

Ocean Group

Design study for the renovation of the wall serving as a docking quay for tugs and barges

Expérience-1.png

Advanced dynamic analyses for multiple dikes - 2024

General Directorate of Dams - MELCCFP

Seismic evaluation of several dams with stabilization solutions

 

Expérience-3.png

Design and monitoring for slope stabilization - 2023/2024

Ministry of Public Security

Design study for stabilization solutions for a slope that has suffered a slide

 

Expérience-2.png

Stability of the slope between basins and a future pit - 2024

Sayona - North America Lithium Mining Complex

Assessment of the stability of the overburden slope between a planned pit and a lake & former polishing pond

Expérience-4.png
bottom of page